The Willows @ Anytown - PCR
HealthLink Development, LLC
10/4/2006
281-578-3712
Thumbnail Image Table
188_MI_1
Caption : East Hall tub/shower room.
|
189_MI_1
Caption : East Hall tub/shower room.
|
190_MI_1
Caption : Shower floor detail - average condition.
|
191_MI_1
Caption : Control door to physical therapy/default facility entrance.
|
192_MI_1
Caption : Physical therapy office.
|
193_MI_1
Caption : Physical therapy,
|
194_MI_1
Caption : Physical therapy,
|
195_MI_1
Caption : Physical therapy,
|
196_MI_1
Caption : Physical therapy,
|
197_MI_1
Caption : Training bathroom in physical therapy.
|
198_MI_1
Caption : Training bathroom in physical therapy.
|
199_MI_1
Caption : Physical therapy office.
|
200_MI_1
Caption : Water stains on ceiling tile in therapy office.
|
201_MI_1
Caption : Central Hall roof looking at porte-cochere.
|
202_MI_1
Caption : Central Hall roof looking to South 1 Hall.
|
203_MI_1
Caption : Central Hall roof top air conditioner.
|
204_MI_1
Caption : Roof drain dislodged from its correct position.
|
205_MI_1
Caption : Parapet wall at Central Hall porte-cochere.
|
206_MI_1
Caption : Connection between South 1 and Center Hall building additions.
|
207_MI_1
Caption : South Hall 1 roof.
|
208_MI_1
Caption : Air conditioners on Souith 1 Hall roof.
|
209_MI_1
Caption : Water ponding on South Hall 1 roof - drainage obstructed by HVAC ducts.
|
210_MI_1
Caption : South Hall 1 roof - note EPDM rubber roof membrane is applied over corridor HVAC ducts.
|
211_MI_1
Caption : South 1 Hall roof looking west.
|
212_MI_1
Caption : Detail - HVAC ducts prevent proper roof drainage.
|
213_MI_1
Caption : Detail - HVAC ducts preventing proper drainage to roof drain.
|
214_MI_1
Caption : Water ponding detail - approx 3/4" deep.
|