The Willows @ Anytown - Property Condition Report

Thumbnail Image Table
134_MI_1
Caption  :  Expansion tank (heating hot water).
135_MI_1
Caption  :  Circulating pump.
136_MI_1
Caption  :  Fire sprinkler riser (facility is only partially sprinkled).
137_MI_1
Caption  :  Center corridor looking north to East Hall (newest addition - 1980's).
138_MI_1
Caption  :  Service corridor - central wing.
139_MI_1
Caption  :  Beauty shop.
140_MI_1
Caption  :  Electrical room - 600 Amp main service, telephone patch panels.
141_MI_1
Caption  :  Telephone patch panels.
142_MI_1
Caption  :  Laundry - soiled linen room.
143_MI_1
Caption  :  Laundry - 55# Milnor washers (6-yrs); 55# American dryer (15+ yrs).
144_MI_1
Caption  :  Laundry - washer drain connection.
145_MI_1
Caption  :  Laundry - 55# American dryers (15+ yrs).
146_MI_1
Caption  :  Central corridor boiler room - Weil-McClain boilers, Lochinvar water heaters.
147_MI_1
Caption  :  Central wing boiler room - Weil-McClain boilers, 1,190,000 BTUH (20+ yrs).
148_MI_1
Caption  :  Lochinvar water heaters, 100-gal, 199,900 BTUH (10-yrs).
149_MI_1
Caption  :  Fire sprinkler riser for north wings (east & west) - note facility is not fully sprinkled.
150_MI_1
Caption  :  Digital phone equipment in storage room.
151_MI_1
Caption  :  Telephone patch panel in storage room.
152_MI_1
Caption  :  Staff lounge/break room.
153_MI_1
Caption  :  Transition from Central Hall to East Hall.
154_MI_1
Caption  :  Handrail detail - handrails need refinishing/better corner protection.
155_MI_1
Caption  :  Activity room.
156_MI_1
Caption  :  Ceiling detail - painted, exposed pre-cast concrete ceiling planks with architectural "dock plank" finish.
157_MI_1
Caption  :  Restorative dining - East Hall.
158_MI_1
Caption  :  West/East Hall nurse station.
159_MI_1
Caption  :  West/East Hall nurse station.
160_MI_1
Caption  :  Nurse station detail - counter top needs maintenance.
Pages:     1 2 3 4 5 6 7 8 9